The Performance DS module can reach up to three floors and is a permanent solution that is also demountable.

The Gaptek System allows the design and construction of permanent bases that offer all the comfort and quality of traditional buildings, with the added value that are demountable, transportable and relocatable.

Housing modules 

The Performance DS housing modules are equipped with everything that military personnel need, all for a greater comfort.

Field hospitals

Performance DS hospitals are designed to develop medical activities up to the level Role III, including long-term stays and all the necessary specialties.

Field hospitals

Performance DS hospitals are designed to develop medical activities up to the level Role III, including long-term stays and all the necessary specialties.

Office modules 

The Performance DS office modules are the optimal work space for military personnel to carry out their work with the best conditions.

Common areas and training zones

The modules can be adapted to any use or function, including dining rooms, kitchens, dressing rooms, access areas, gyms and training areas and toilets.

Common areas and training zones

The modules can be adapted to any use or function, including dining rooms, kitchens, dressing rooms, access areas, gyms and training areas and toilets.

Characteristics

Performance DS Modules

Specifications

Dimensions: Modules of minimum 2,40m x 2,40m  with unlimited longitudinal scalability and up to 3 floors

Assembly time: Depending on dimensions and demountability grade

Required cementation: No (recommended)

Structure:

  • Structure assembly: Mechanical joints
  • Material: High resistance alloy aluminum AW-6082-T6
  • Warranty: 20 years

Minimum Resistances:

  • Wind: 104 km/h
  • Fire: REI30
  • Snow: 0.5 KN/sqm
  • Earthquake Standard: 0.1 g

Envelope: Insulating panel

Certifications:

  • ISO 9001
  • UNE-EN ISO 14001 in Environmental Management
  • UNE-ISO/IEC 27001 in Information Security Management
  • CE Marking in all materials, including EN-1090 in relation to steel and aluminum structures

 

Options

Assembly:

  • In charge of Gaptek
  • Autonomous method: Training and supervision offered to the client
    • On site
    • On Gaptek facilities

Distribution options:

  • Medical consultations
  • Waiting room
  • Operating rooms
  • X-rays
  • Warehouses
  • Other uses: dressing room, dining room, office, toilets, etc.

Resistances Plus:

  • Hurricane Kit: up to 250 km/h
  • Fire Plus: up to REI120
  • Snow Plus: up to 2 KN/sqm

Additional elements:

  • Aggregation of multiple modules to create complex
  • Adjustable height legs
  • Interconnection systems between modules: platforms, stairs…
  • Ground connection
  • High efficiency air cooling system
  • Assembly tools (autonomous assembly method)
  • Ballistic protection

Additional services:

  • Maintenance
  • Logistics and storage
  • Lifetime warranty with Gaptek maintenance
  • Foundation on lands that require it

Applicable standards:

  • International Building Codes
  • Eurocodes
  • Spanish Technical Building Codes (CTE)
  • UFC

 

Gaptek is a synonym of trust

Reduced construction time

Our solutions are predesigned for a quick on site assembly

Turnkey solutions

From the design and production to the construction and maintenance of the buildings

Predefined quality

All constructive elements comply with CE marking and undertake quality controls

Energy efficiency

Passive systems are incorporated for major energy savings

Low maintenance

Minimum maintenance thanks to the aluminum structure, even in aggressive environments

Scalability

Extensible solutions thanks to the use of the modular architecture principle

Contact us now

FAQs

What structural materials are used by Gaptek?

Gaptek has developed a construction system based on prefabricated profiles and dry joints, using aluminum as the structural material for the advantages it has as opposed to traditional construction and its great adaptability.

The advantages of aluminum as structural material as opposed to steel are numerous, such as the optimization and customization of the profiles according to its specific use, as compared with steel’s standard and normalized profiles, the lightness of the profiles and its resistance, the low maintenance thanks to the anticorrosive properties of aluminum and its total recyclability.

How is the Performance DS module assembled?

The Performance DS module can be quickly and easily assembled 100% by military personnel, following the assembly manual and after receiving training from Gaptek, always under the supervision of a Gaptek technician.

Thanks to the lightness of aluminum profiles, the structural materials optimization and the simple assembly of our system using dry joints, it is not required to use very heavy machinery or large cranes to assemble our modules. Only ordinary machinery such as lifting platforms and telescopic cranes.

What are the possible uses/functions of the Performance DS module?

The Performance DS module can be used as housing modules, offices, storage and field hospitals, as for common spaces such as dining rooms, dressing rooms, kitchens, toilets, etc.

Contact form

I would like to send this message to...

6 + 15 =

Last posts

Gaptek will exhibit life-size products at FEINDEF in Madrid

Gaptek will present its construction system and its innovations at the International Defense and Security Fair (FEINDEF), which will be held for the first time in Madrid from May 29th to 31st. In our large exhibition space we will show our products on a real scale,...

UAV hangar, support buildings and communication towers for the NSPA

We are proud to announce the finalization of the first project contracted through the NSPA, the NATO Support and Procurement Agency. The project consists of the delivery of deployable support buildings for the new unmanned aerial vehicles (UAV) of the Air Force of the...

A400M hangar, designed and built by Gaptek, is rented by Airbus

Airbus Defence & Space has rented an MRO A400M hangar for the modernization of the military aircraft in Sevilla, which was designed and built by Gaptek. The European consortium reports that with these new facilities, added to the others 11,000 square metres of...

Estamos utilizando cookies en nuestro sitio web

Por favor, confirme, si acepta nuestras cookies de seguimiento. También puede rechazar el seguimiento, por lo que puede seguir visitando nuestro sitio web sin que se envíen datos a servicios de terceros.